Construction jobs are rarely billed once. Most are billed in draws as the work progresses, with a share held back as retainage until completion. This template is set up as a progress invoice against a contract sum.

Free to createNo account neededUnited States format

Construction invoice · example

FromGranite Ridge Builders LLC
ToThomas and Elena Wright
CurrencyUSD
DescriptionQtyPriceAmount
Draw 2, demolition and framing: now 100% complete (60% billed on draw 1)1$4,800.00$4,800.00
Draw 2, plumbing rough-in: 50% complete1$4,750.00$4,750.00
Change order 1: additional kitchen window, approved 12 September1$1,850.00$1,850.00
Total$11,400.00

Keep this document

Enter your email and we'll send a sign-in link. Your draft is saved to your account when you open it.

How to use the construction invoice

  1. Enter the project, site address and job or contract number.
  2. Bill the share of each phase completed this period.
  3. Add approved change orders as separate lines.
  4. State the retainage and lien-waiver terms, then save and issue.

Progress billing, worked through

Take a 48,000 kitchen and bath remodel billed in monthly draws. By the end of month two, framing is finished (60% was billed on draw 1), plumbing rough-in is half done and one change order for an extra window has been approved. The invoice bills what was earned this period; the owner withholds 10% retainage from it.

LineScheduled valueCompleteBilled this period
Demolition and framing12,000100% (60% billed before)4,800
Plumbing rough-in9,50050%4,750
Change order 1: additional window1,850100%1,850
Retainage withheld at 10%-1,140
Payable this period10,260

What to include on every construction invoice

  • Project name, site address and contract number
  • Application or invoice number and the period covered
  • Original contract sum, approved change orders and the revised contract sum
  • Work completed to date and this period, by phase or schedule of values
  • Retainage held this period and to date
  • Previous payments received and the balance due
  • Your contractor licence number, where your state requires it
  • Lien notice or waiver terms where applicable

Questions

What is retainage?

A percentage of each progress payment, commonly 5 to 10%, that the owner holds back until the job is substantially complete. Show it on every draw so the running total held is clear. Several states cap the rate.

What are AIA G702 and G703?

Standard application-for-payment forms from the American Institute of Architects. The G702 summarises the contract sum and payments; the G703 continuation sheet lists each line of the schedule of values. Large commercial jobs often require them; residential clients usually accept an itemised invoice.

Should I send a lien waiver with my invoice?

Many owners and lenders require a conditional lien waiver with each payment application and an unconditional one once paid. Rules and forms vary by state.

Can I bill for materials before they are installed?

Only if the contract allows payment for stored materials, usually with proof of purchase and insurance.

Keep everything you make

Sign in with your email and your drafts become documents in your own business, with clients, payments and books alongside.